UNKNOWN159041 is a substation-adjacent datacenter candidate site in Vernon, Wisconsin, interconnecting through MISO. It screens at 57.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN159041
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilitySCENIC RIVERS ENERGY COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSupraNet Communications Madison
IXP distance62.3 mi
Fiber providers6
Fiber coverage95.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 1211362828
DC distance37.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.41¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,236

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN159041

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
45
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Vernon, ranked by DC Readiness.

Sites near UNKNOWN159041
SiteTypeVoltageCapacityQueue waitScore
EC Coal Vernon CountyGreenfield——1.4 yrs60.3
EC Coal Vernon CountyGreenfield——1.4 yrs60.1
EC Near GenoaGreenfield——1.4 yrs59.8
EC Coal Vernon CountyGreenfield——1.4 yrs59.8
EC Near GenoaGreenfield——1.4 yrs58.2
EC Near GenoaGreenfield——1.4 yrs58.0
OZ VernonGreenfield——1.4 yrs57.9
EC Near GenoaGreenfield——1.4 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN159041, Vernon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.