EC Near Genoa

Greenfield

Vernon, Wisconsin · MISO

DC Readiness
50.8
Fair / 100

EC Near Genoa is a greenfield datacenter candidate site in Vernon, Wisconsin, interconnecting through MISO. It screens at 50.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance66.5 mi
Fiber providers7
Fiber coverage46.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance154.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerAMERICAN TRANSMISSION CO
Land owner typeprivate
Buildability50.0/100
Former usenear retired coal plant (10km)

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterNP Rochester
DC distance66.5 mi
Nearest rail1.1 mi
Nearest gas pipeline8.5 mi
Nearest fiber route100.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.41¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,236

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
19
Energy cost10%
85
Water risk8%
92
Natural hazard8%
53
Buildability7%
50
Labor market4%
50
DC cluster4%
25
Land / acreage3%
47
Construction cost3%
67
Gas pipeline2%
73
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Vernon, ranked by DC Readiness.

Sites near EC Near Genoa
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN159041Substation-Adjacent161 kV100 MW1.4 yrs66.5
Greenfield (DPC BELL CENTER - UNKNOWN15904)Greenfield161 kV100 MW1.4 yrs63.2
EC Coal Vernon CountyGreenfield1.4 yrs61.5
EC Coal Vernon CountyGreenfield1.4 yrs61.2
EC Near GenoaGreenfield1.4 yrs59.8
OZ VernonGreenfield1.4 yrs59.3
EC Near GenoaGreenfield1.4 yrs58.2
EC Near GenoaGreenfield1.4 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Genoa, Vernon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.