Datacenter Sites in Ozaukee, Wisconsin

Ozaukee has 28 scored datacenter candidate sites averaging 58.3/100 DC Readiness, with a catalogued aggregate of 4,740 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

28
Candidate sites
58.3/100
Avg DC Readiness
4,740 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating

Site-selection context for Ozaukee

Yessales_tax_exemption
Datacenter tax incentive
13.04¢/kWh
Commercial electricity
8.89¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,047
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Ozaukee

Top datacenter sites in Ozaukee
SiteTypeVoltageCapacityQueue waitScore
SHEBOYGAN FALLS STATIONSubstation-Adjacent345 kV600 MW1.4 yrs73.5
TAP138061Substation-Adjacent345 kV600 MW1.4 yrs72.6
CEDARSAUKSubstation-Adjacent345 kV600 MW1.4 yrs69.7
Greenfield (CEDARSAUK - EDGEWATER STATION)Greenfield345 kV600 MW1.4 yrs67.0
PORT WASHINGTON SW YDSubstation-Adjacent138 kV100 MW1.4 yrs67.0
Greenfield (TAP138061 - SHEBOYGAN FALLS ST)Greenfield345 kV600 MW1.4 yrs66.6
EC Near Port Washington Generating StationGreenfield1.4 yrs64.2
LYNDONSubstation-Adjacent138 kV100 MW1.4 yrs63.4
RIVER BENDSubstation-Adjacent138 kV100 MW1.4 yrs63.3
Port Washington Generating StationBrownfield340 MW1.4 yrs62.0
EC Near Port Washington Generating StationGreenfield1.4 yrs61.6
EC Near Port Washington Generating StationGreenfield1.4 yrs61.6
Greenfield (CEDARSAUK - EDGEWATER STATION)Greenfield345 kV600 MW1.4 yrs61.1
FREDONIASubstation-Adjacent138 kV100 MW1.4 yrs60.8
TAP137998Substation-Adjacent138 kV100 MW1.4 yrs60.7
EC Near Port Washington Generating StationGreenfield1.4 yrs59.2
Greenfield (RANGE LINE SW - PORT WASHINGTO)Greenfield138 kV100 MW1.4 yrs57.5
Greenfield (CEDARSAUK - ELKHART LAKE)Greenfield138 kV100 MW1.4 yrs54.5
EC Near Port Washington Generating StationGreenfield1.4 yrs54.5
EC Near Port Washington Generating StationGreenfield1.4 yrs53.3
EC Near Port Washington Generating StationGreenfield1.4 yrs50.7
EC Near Port Washington Generating StationGreenfield1.4 yrs50.6
EC Near Port Washington Generating StationGreenfield1.4 yrs50.1
Greenfield (HOLLAND - PLYMOUTH SUB 4)Greenfield138 kV100 MW1.4 yrs49.0
Riebe Sales And Service IncIndustrial45.9

Ozaukee datacenter FAQ

How many datacenter sites are in Ozaukee?
28 scored datacenter candidate sites, averaging 58.3/100 DC Readiness.
Does Ozaukee offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Ozaukee?
FEMA's National Risk Index rates Ozaukee as "Relatively Low" (score 22).
What are industrial electricity rates in Ozaukee?
Average industrial electricity is 8.89¢/kWh and commercial is 13.04¢/kWh in Ozaukee.

Dataset updated . Screening estimates derived from public data sources.