Datacenter Sites in Ozaukee, Wisconsin

Ozaukee has 21 scored datacenter candidate sites averaging 56.0/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

21
Candidate sites
56.0/100
Avg DC Readiness
1,300 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Ozaukee

Site-selection context for Ozaukee

Yessales_tax_exemption
Datacenter tax incentive
13.04¢/kWh
Commercial electricity
8.89¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,047
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Ozaukee

Top datacenter sites in Ozaukee
SiteTypeVoltageCapacityQueue waitScore
CEDARSAUKSubstation-Adjacent345 kV600 MW2.8 yrs65.8
EC Near Port Washington Generating StationGreenfield——1.4 yrs62.6
PORT WASHINGTON SW YDSubstation-Adjacent138 kV100 MW2.8 yrs61.7
EC Near Port Washington Generating StationGreenfield——1.4 yrs60.0
RIVER BENDSubstation-Adjacent138 kV100 MW2.8 yrs59.9
EC Near Port Washington Generating StationGreenfield——1.4 yrs59.8
FREDONIASubstation-Adjacent138 kV100 MW2.8 yrs58.3
EC Near Port Washington Generating StationGreenfield——1.4 yrs57.7
TAP137998Substation-Adjacent138 kV100 MW2.8 yrs57.5
HOLLANDSubstation-Adjacent138 kV100 MW2.8 yrs57.4
Hanover Ave RowIndustrial——2.8 yrs54.0
Mine SiteFormer Mine——2.8 yrs53.8
Riebe Sales And Service IncIndustrial——2.8 yrs53.7
Greenfield (RANGE LINE SW - PORT WASHINGTO)Greenfield138 kV100 MW2.8 yrs53.5
EC Near Port Washington Generating StationGreenfield——1.4 yrs53.4
EC Near Port Washington Generating StationGreenfield——1.4 yrs53.0
Car/Trailer LotIndustrial——2.8 yrs52.1
EC Near Port Washington Generating StationGreenfield——1.4 yrs51.7
Greenfield (CEDARSAUK - ELKHART LAKE)Greenfield138 kV100 MW2.8 yrs51.3
EC Near Port Washington Generating StationGreenfield——1.4 yrs49.2
EC Near Port Washington Generating StationGreenfield——1.4 yrs49.0

Ozaukee datacenter FAQ

How many datacenter sites are in Ozaukee?
21 scored datacenter candidate sites, averaging 56.0/100 DC Readiness.
Does Ozaukee offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Ozaukee?
FEMA's National Risk Index rates Ozaukee as "Relatively Low" (score 22).
What are industrial electricity rates in Ozaukee?
Average industrial electricity is 8.89¢/kWh and commercial is 13.04¢/kWh in Ozaukee.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Ozaukee, Wisconsin. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.