Datacenter Sites in Ozaukee, Wisconsin

Ozaukee has 28 scored datacenter candidate sites averaging 59.3/100 DC Readiness, with a catalogued aggregate of 4,740 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

28
Candidate sites
59.3/100
Avg DC Readiness
4,740 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Ozaukee

Site-selection context for Ozaukee

Yessales_tax_exemption
Datacenter tax incentive
13.04¢/kWh
Commercial electricity
8.89¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,047
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Ozaukee

Top datacenter sites in Ozaukee
SiteTypeVoltageCapacityQueue waitScore
CEDARSAUKSubstation-Adjacent345 kV600 MW2.8 yrs64.8
EC Near Port Washington Generating StationGreenfield1.4 yrs64.1
EC Near Port Washington Generating StationGreenfield1.4 yrs61.5
EC Near Port Washington Generating StationGreenfield1.4 yrs61.4
PORT WASHINGTON SW YDSubstation-Adjacent138 kV100 MW2.8 yrs59.9
RIVER BENDSubstation-Adjacent138 kV100 MW2.8 yrs59.3
EC Near Port Washington Generating StationGreenfield1.4 yrs59.0
FREDONIASubstation-Adjacent138 kV100 MW2.8 yrs56.7
Hanover Ave RowIndustrial2.8 yrs55.5
Mine SiteFormer Mine2.8 yrs55.3
Riebe Sales And Service IncIndustrial2.8 yrs55.2
HOLLANDSubstation-Adjacent138 kV100 MW2.8 yrs55.0
EC Near Port Washington Generating StationGreenfield1.4 yrs54.8
TAP137998Substation-Adjacent138 kV100 MW2.8 yrs54.8
EC Near Port Washington Generating StationGreenfield1.4 yrs54.3
Car/Trailer LotIndustrial2.8 yrs53.6
EC Near Port Washington Generating StationGreenfield1.4 yrs53.1
Greenfield (RANGE LINE SW - PORT WASHINGTO)Greenfield138 kV100 MW2.8 yrs52.3
EC Near Port Washington Generating StationGreenfield1.4 yrs50.6
EC Near Port Washington Generating StationGreenfield1.4 yrs50.4
Greenfield (CEDARSAUK - ELKHART LAKE)Greenfield138 kV100 MW2.8 yrs48.5

Ozaukee datacenter FAQ

How many datacenter sites are in Ozaukee?
28 scored datacenter candidate sites, averaging 59.3/100 DC Readiness.
Does Ozaukee offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Ozaukee?
FEMA's National Risk Index rates Ozaukee as "Relatively Low" (score 22).
What are industrial electricity rates in Ozaukee?
Average industrial electricity is 8.89¢/kWh and commercial is 13.04¢/kWh in Ozaukee.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Ozaukee, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.