Skip to content
Gridcensus

Ozaukee, Wisconsin · MISO

DC Readiness
64.8
Good / 100

CEDARSAUK is a substation-adjacent datacenter candidate site in Ozaukee, Wisconsin, interconnecting through MISO. It screens at 64.8/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCEDARSAUK
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEthoplex Data Center
IXP distance13.7 mi
Fiber providers4
Fiber coverage31.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterEthoplex Data Center
DC distance13.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.04¢/kWh
Industrial electricity8.89¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$8,047

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
40
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Ozaukee, ranked by DC Readiness.

Sites near CEDARSAUK
SiteTypeVoltageCapacityQueue waitScore
EC Near Port Washington Generating StationGreenfield1.4 yrs64.1
EC Near Port Washington Generating StationGreenfield1.4 yrs61.5
EC Near Port Washington Generating StationGreenfield1.4 yrs61.4
PORT WASHINGTON SW YDSubstation-Adjacent138 kV100 MW2.8 yrs59.9
RIVER BENDSubstation-Adjacent138 kV100 MW2.8 yrs59.3
EC Near Port Washington Generating StationGreenfield1.4 yrs59.0
FREDONIASubstation-Adjacent138 kV100 MW2.8 yrs56.7
Hanover Ave RowIndustrial2.8 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CEDARSAUK, Ozaukee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.