EC Near Domtar Paper Company Rothschild

Greenfield

Marathon County, Wisconsin · MISO

DC Readiness
61.6
Good / 100

EC Near Domtar Paper Company Rothschild is a greenfield datacenter candidate site in Marathon County, Wisconsin, interconnecting through MISO. It screens at 61.6/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP901 Commerce Dr
IXP distance33.6 mi
Fiber providers7
Fiber coverage46.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance233.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN STATES POWER CO - WISCONSIN
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteNORTH CENTRAL HEALTH CARE
Hazard sub-score68/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenter901 Commerce Dr
DC distance33.6 mi
Nearest rail1.1 mi
Nearest gas pipeline2.2 mi
Nearest fiber route66.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity7.90¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,576

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
63
Energy cost10%
85
Water risk8%
94
Natural hazard8%
68
Buildability7%
92
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
67
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Marathon County, ranked by DC Readiness.

Sites near EC Near Domtar Paper Company Rothschild
SiteTypeVoltageCapacityQueue waitScore
WESTONSubstation-Adjacent345 kV600 MW1.4 yrs77.4
GARDNER PARKSubstation-Adjacent345 kV600 MW1.4 yrs73.9
CASSELSubstation-Adjacent115 kV100 MW1.4 yrs69.9
SHERMAN STSubstation-Adjacent115 kV100 MW1.4 yrs69.2
WHITCOMBSubstation-Adjacent115 kV100 MW1.4 yrs69.2
Greenfield (STONE LAKE - GARDNER PARK)Greenfield345 kV600 MW1.4 yrs69.0
STRATFORDSubstation-Adjacent115 kV100 MW1.4 yrs69.0
UNKNOWN171986Substation-Adjacent115 kV100 MW1.4 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Domtar Paper Company Rothschild, Marathon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.