DC Readiness
49.1
Fair / 100

CHEQUAMEGON N.F. is a federal excess datacenter candidate site in Florence County, Wisconsin, interconnecting through MISO. It screens at 49.1/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPMI Tech - Main Campus
IXP distance83.8 mi
Fiber providers4
Fiber coverage4.5%
Max download7 Mbps

Site characteristics

Acreage34 ac
Former useOffice Building Locations

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterMI Tech - Main Campus
DC distance83.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.79¢/kWh
Industrial electricity7.90¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,734

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Florence County, ranked by DC Readiness.

Sites near CHEQUAMEGON N.F.
SiteTypeVoltageCapacityQueue waitScore
ASPENSubstation-Adjacent138 kV100 MW2.8 yrs51.5
UNKNOWN171302Substation-Adjacent69 kV50 MW3.8 yrs49.2
BRULESubstation-Adjacent69 kV50 MW3.8 yrs49.2
MICHIGAMME FALLS HYSubstation-Adjacent69 kV50 MW3.8 yrs49.2
PEAVY FALL HYSubstation-Adjacent69 kV50 MW3.8 yrs49.2
ARMORYSubstation-Adjacent69 kV50 MW3.8 yrs49.2
FLORENCESubstation-Adjacent69 kV50 MW2.8 yrs49.1
GOODMANSubstation-Adjacent69 kV50 MW2.8 yrs49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CHEQUAMEGON N.F., Florence County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.