PEAVY FALL HY
Substation-AdjacentFlorence County, Michigan · PJM
PEAVY FALL HY is a substation-adjacent datacenter candidate site in Florence County, Michigan, interconnecting through PJM. It screens at 49.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Florence County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ASPEN | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 51.5 |
| ARMORY | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 49.2 |
| BRULE | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 49.2 |
| UNKNOWN171302 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 49.2 |
| MICHIGAMME FALLS HY | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 49.2 |
| CHEQUAMEGON N.F. | Federal Excess | — | — | 2.8 yrs | 49.1 |
| GOODMAN | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 49.1 |
| FLORENCE | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 49.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PEAVY FALL HY, Florence County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.