At a glance

EC Near Danbury Diesel is a greenfield datacenter candidate site in Burnett, Wisconsin, scoring 51.0/100 DC Readiness — 31st of 38 scored sites in the county. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDuluth Missabe
IXP distance52.5 mi
Fiber providers4
Fiber coverage76.9%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance291.1 mi

Site characteristics

Site typeGreenfield
Land contactBurnett County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone A (SFHA)
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterDuluth Missabe
DC distance52.5 mi
Nearest rail17.2 mi
Nearest gas pipeline21.9 mi
Nearest fiber route181.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.01¢/kWh
Industrial electricity13.86¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,584

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Danbury Diesel

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Danbury Diesel compare with other sites in Burnett?

EC Near Danbury Diesel ranks 31st of 38 scored candidate sites in Burnett. Its 51.0/100 is roughly in line with the county average of 53.0. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is speed to power (48 vs 48) and its weakest is natural hazard (53 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Danbury Diesel to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Duluth Missabe at 52.5 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Duluth Missabe, 52.5 miles away.

What are the flood, water and hazard risks at EC Near Danbury Diesel?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 0.30 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Burnett "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
59
Energy cost10%
85
Water risk7%
86
Natural hazard6%
53
Buildability7%
15
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
67
Gas pipeline2%
30
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Burnett, ranked by DC Readiness.

Sites near EC Near Danbury Diesel
SiteTypeVoltageCapacityQueue waitScore
EC Near Danbury DieselGreenfield——4.3 yrs55.4
UNKNOWN156962Substation-Adjacent69 kV50 MW4.3 yrs55.2
UNKNOWN132916Substation-Adjacent69 kV50 MW4.3 yrs55.2
TAP155820Substation-Adjacent69 kV50 MW4.3 yrs55.1
UNKNOWN163370Substation-Adjacent69 kV50 MW4.3 yrs55.0
UNKNOWN161938Substation-Adjacent69 kV50 MW4.3 yrs54.9
TAP163373Substation-Adjacent69 kV50 MW4.3 yrs54.8
UNKNOWN163452Substation-Adjacent69 kV50 MW4.3 yrs54.8

EC Near Danbury Diesel: common questions

What is the DC Readiness score of EC Near Danbury Diesel?

EC Near Danbury Diesel scores 51.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 31st of 38 scored sites in Burnett. The Burnett average is 53.0 and the Wisconsin average is 55.4.

What grid region is EC Near Danbury Diesel in?

EC Near Danbury Diesel is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Danbury Diesel in a flood zone?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns EC Near Danbury Diesel?

Parcel records list the owner as NORTHERN STATES POWER CO (private land).

How far is EC Near Danbury Diesel from an internet exchange?

The nearest internet exchange facility is Duluth Missabe, about 52.5 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Danbury Diesel, Burnett, WI”, https://gridcensus.com/datacenter-sites/wisconsin/burnett/ec-near-danbury-diesel-1f741fd4 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Danbury Diesel, Burnett is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.