OROVILLE-TONASKET, CHIEF JOSEPH PROJECT

Federal Excess

Okanogan County, Washington · WECC

DC Readiness
39.0
Limited / 100

OROVILLE-TONASKET, CHIEF JOSEPH PROJECT is a federal excess datacenter candidate site in Okanogan County, Washington, interconnecting through WECC. It screens at 39.0/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPH5 Data Centers Quincy
IXP distance100.6 mi

Site characteristics

Acreage10 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterMicrosoft EAT03
DC distance94.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity6.85¢/kWh
Industrial electricity5.86¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$1,929

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
31
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Okanogan County, ranked by DC Readiness.

Sites near OROVILLE-TONASKET, CHIEF JOSEPH PROJECT
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206474Substation-Adjacent275 kV300 MW1.7 yrs66.7
EAST OMAKSubstation-Adjacent230 kV300 MW1.7 yrs65.8
OKANOGANSubstation-Adjacent230 kV300 MW1.7 yrs63.5
UNKNOWN206248Substation-Adjacent115 kV100 MW1.7 yrs62.1
TONASKETSubstation-Adjacent115 kV100 MW1.7 yrs61.3
OROVILLESubstation-Adjacent115 kV100 MW1.7 yrs60.9
UNKNOWN209274Substation-Adjacent115 kV100 MW1.7 yrs60.7
TAP206247Substation-Adjacent115 kV100 MW1.7 yrs60.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen