DC Readiness
49.2
Fair / 100

At a glance

Greenfield (UNKNOWN117064 - TAP152824) is a greenfield datacenter candidate site in WYTHE, Virginia, scoring 49.2/100 DC Readiness — 46th of 58 scored sites in the county. Its nearest substation is UNKNOWN117064. It sits in the PJM grid region, where interconnection has averaged 5.1 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN117064
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance73.6 mi
Fiber providers5
Fiber coverage66.0%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance73.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$4,284

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN117064 - TAP152824)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN117064 - TAP152824) compare with other sites in WYTHE?

Greenfield (UNKNOWN117064 - TAP152824) ranks 46th of 58 scored candidate sites in WYTHE. Its 49.2/100 is roughly in line with the county average of 50.2. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (65 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN117064 - TAP152824) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN117064, is the closest grid connection point on record and operates at 138 kV. The nearest located transmission bottleneck is FREMNT-FREMONTC A 138 KV (PJM), 80 miles away. For connectivity, the nearest internet exchange facility is 801 Main Street - Lenoir at 73.6 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is 801 Main Street - Lenoir, 73.6 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN117064 - TAP152824)?

At the county level, FEMA's National Risk Index rates WYTHE "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in WYTHE, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN117064 - TAP152824)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (JACKSONS FERRY - BROADFORD (76)Greenfield765 kV1,000 MW5.1 yrs57.6
UNKNOWN117058Substation-Adjacent138 kV100 MW5.1 yrs56.0
LEE HIGHWAYSubstation-Adjacent138 kV100 MW5.1 yrs56.0
TAP152824Substation-Adjacent138 kV100 MW5.1 yrs55.9
PROGRESS PARKSubstation-Adjacent138 kV100 MW5.1 yrs55.9
UNKNOWN117063Substation-Adjacent138 kV100 MW5.1 yrs55.1
UNKNOWN117064Substation-Adjacent138 kV100 MW5.1 yrs55.1
Wythe County Progress ParkShovel-Ready——5.1 yrs50.0

Greenfield (UNKNOWN117064 - TAP152824): common questions

What is the DC Readiness score of Greenfield (UNKNOWN117064 - TAP152824)?

Greenfield (UNKNOWN117064 - TAP152824) scores 49.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 46th of 58 scored sites in WYTHE. The WYTHE average is 50.2 and the Virginia average is 52.6.

What is the nearest substation to Greenfield (UNKNOWN117064 - TAP152824)?

The nearest mapped substation is UNKNOWN117064, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

What grid region is Greenfield (UNKNOWN117064 - TAP152824) in?

Greenfield (UNKNOWN117064 - TAP152824) is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is Greenfield (UNKNOWN117064 - TAP152824) from an internet exchange?

The nearest internet exchange facility is 801 Main Street - Lenoir, about 73.6 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN117064 - TAP152824), WYTHE, VA”, https://gridcensus.com/datacenter-sites/virginia/wythe/greenfield-unknown117064-tap152824-34861619 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN117064 - TAP152824), WYTHE is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.