Greenfield (JACKSONS FERRY - BROADFORD (76)

Greenfield

WYTHE, Virginia · PJM

DC Readiness
54.5
Fair / 100

Greenfield (JACKSONS FERRY - BROADFORD (76) is a greenfield datacenter candidate site in WYTHE, Virginia, interconnecting through PJM. It screens at 54.5/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationJACKSONS FERRY
Substation voltage765 kV
Available capacity1,000 MW

Speed to power

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance71.6 mi
Fiber providers5
Fiber coverage66.0%

Site characteristics

Site typeGreenfield
Land contactWythe County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance71.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$4,284

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
38
Fiber connectivity12%
36
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in WYTHE, ranked by DC Readiness.

Sites near Greenfield (JACKSONS FERRY - BROADFORD (76)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117064Substation-Adjacent138 kV100 MW3.8 yrs52.5
KLOCKNER PENTAPLAST OF AMERICA, INC. (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING)Manufacturing3.5 yrs52.5
TAP152824Substation-Adjacent138 kV100 MW3.8 yrs52.5
LEE HIGHWAYSubstation-Adjacent138 kV100 MW3.8 yrs52.5
PROGRESS PARKSubstation-Adjacent138 kV100 MW3.8 yrs52.5
UNKNOWN117063Substation-Adjacent138 kV100 MW3.8 yrs52.5
HUTCHINSON SEALING SYSTEMS, INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing3.5 yrs52.5
UNKNOWN117058Substation-Adjacent138 kV100 MW3.8 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (JACKSONS FERRY - BROADFORD (76), WYTHE. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.