Jericho Gravel Pit

Brownfield

Chittenden County, Vermont · ISO-NE

DC Readiness
58.2
Good / 100

Jericho Gravel Pit is a brownfield datacenter candidate site in Chittenden County, Vermont, interconnecting through ISO-NE. It screens at 58.2/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationVEC UNDERHILL
Substation distance2.3 mi
Substation voltage35 kV
Available capacity2 MW
LMP zoneISONE_VT
Wholesale LMP$43.90/MWh
Utility commercial rate0.19¢/kWh
UtilityVERMONT ELECTRIC COOPERATIVE, INCcooperative

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth5
Avg queue wait3.9 yrs

Connectivity

Nearest IXPTech Vault South Burlington
IXP distance8.4 mi
Fiber providers7
Fiber coverage62.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance442.7 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usemine
Existing capacity2 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteGLOBAL MONTELLO GROUP 424
Hazard sub-score75/100
Construction cost index97.9 (avg 100)

Location context

Nearest datacenterTech Vault South Burlington
DC distance8.4 mi
Nearest rail4.7 mi
Nearest gas pipeline8.5 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity18.69¢/kWh
Industrial electricity12.08¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$6,230

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Jericho Gravel Pit

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
26
Speed to power20%
39
Fiber connectivity12%
85
Energy cost10%
76
Water risk7%
91
Natural hazard6%
75
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
58
Construction cost3%
68
Gas pipeline2%
73
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Chittenden County, ranked by DC Readiness.

Sites near Jericho Gravel Pit
SiteTypeVoltageCapacityQueue waitScore
South Burlington LandfillBrownfield—2 MW3.9 yrs66.0
OZ ChittendenGreenfield——3.5 yrs63.3
EC Near Essex Junction 19Greenfield——3.5 yrs61.8
ESSEXSubstation-Adjacent115 kV100 MW3.9 yrs61.6
EAST AVENUESubstation-Adjacent115 kV100 MW3.9 yrs60.6
UNKNOWN132786Substation-Adjacent115 kV100 MW3.9 yrs60.5
QUEEN CITYSubstation-Adjacent115 kV100 MW3.9 yrs60.5
WILLISTONSubstation-Adjacent115 kV100 MW3.9 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Jericho Gravel Pit, Chittenden County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.