WEBER BASIN

Federal Excess

Weber County, Utah · WECC

DC Readiness
35.1
Limited / 100

WEBER BASIN is a federal excess datacenter candidate site in Weber County, Utah, interconnecting through WECC. It screens at 35.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance33.3 mi

Site characteristics

Acreage7 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterLowest Host/Empire Technology
DC distance33.3 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.23¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$18,674

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Weber County, ranked by DC Readiness.

Sites near WEBER BASIN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206362Substation-Adjacent230 kV300 MW1.7 yrs69.6
TAP206361Substation-Adjacent230 kV300 MW1.7 yrs69.6
BEN LOMONDSubstation-Adjacent345 kV600 MW1.7 yrs69.3
UNKNOWN201469Substation-Adjacent230 kV300 MW1.7 yrs68.6
EAST BENCHSubstation-Adjacent230 kV300 MW1.7 yrs68.6
TAP206696Substation-Adjacent230 kV300 MW1.7 yrs68.3
UNKNOWN201354Substation-Adjacent230 kV300 MW1.7 yrs68.2
BRIGHAMSubstation-Adjacent230 kV300 MW1.7 yrs67.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEBER BASIN, Weber County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.