DC Readiness
61.4
Good / 100

TAP206125 is a substation-adjacent datacenter candidate site in Weber County, Utah, interconnecting through WECC. It screens at 61.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP206125
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance26.8 mi
Fiber providers13
Fiber coverage76.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterLowest Host/Empire Technology
DC distance26.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.23¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$18,674

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP206125

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
57
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Weber County, ranked by DC Readiness.

Sites near TAP206125
SiteTypeVoltageCapacityQueue waitScore
BEN LOMONDSubstation-Adjacent345 kV600 MW6.9 yrs62.0
UNKNOWN206362Substation-Adjacent230 kV300 MW6.9 yrs62.0
TAP206408Substation-Adjacent230 kV300 MW6.9 yrs61.8
TAP206360Substation-Adjacent230 kV300 MW6.9 yrs61.7
UNKNOWN201353Substation-Adjacent230 kV300 MW6.9 yrs61.7
UNKNOWN201469Substation-Adjacent230 kV300 MW6.9 yrs61.7
UNKNOWN206359Substation-Adjacent230 kV300 MW6.9 yrs61.7
TAP206417Substation-Adjacent230 kV300 MW6.9 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.