Skip to content
Gridcensus

EC Near Bloomington Power Plant

Greenfield

Washington County, Utah · WECC

DC Readiness
63.4
Good / 100

EC Near Bloomington Power Plant is a greenfield datacenter candidate site in Washington County, Utah, interconnecting through WECC. It screens at 63.4/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPTonaquint Data Center - Saint George
IXP distance5.7 mi
Fiber providers9
Fiber coverage68.3%
Nearest cloud providerGCP
Nearest cloud regionus-west4
Cloud region distance102.5 mi

Site characteristics

Site typeGreenfield
Land contactWashington County Assessor
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former usenear retired oil plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index86.7 (avg 100)

Location context

Nearest datacenterTonaquint Data Center - Saint George
DC distance5.7 mi
Nearest rail2.4 mi
Nearest gas pipeline13.7 mi
Nearest fiber route96.2 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.00¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,684

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
52
Fiber connectivity12%
87
Energy cost10%
96
Water risk8%
48
Natural hazard8%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
85
Land / acreage3%
51
Construction cost3%
78
Gas pipeline2%
56
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near EC Near Bloomington Power Plant
SiteTypeVoltageCapacityQueue waitScore
GREEN VALLEYSubstation-Adjacent230 kV300 MW6.9 yrs63.6
TAP206657Substation-Adjacent230 kV300 MW6.9 yrs63.5
TAP206312Substation-Adjacent230 kV300 MW6.9 yrs63.3
TAP206303Substation-Adjacent230 kV300 MW6.9 yrs63.0
UNKNOWN201442Substation-Adjacent230 kV300 MW6.9 yrs62.9
UNKNOWN206624Substation-Adjacent230 kV300 MW6.9 yrs62.9
EC Near Bloomington Power PlantGreenfield1.7 yrs62.6
SKYLINESubstation-Adjacent230 kV300 MW6.9 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Bloomington Power Plant, Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.