Datacenter Sites in Washington County, Utah
Washington County has 127 scored datacenter candidate sites averaging 60.0/100 DC Readiness, with a catalogued aggregate of 43,102 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
127
Candidate sites
60.0/100
Avg DC Readiness
43,102 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Washington County
Yessales_tax_exemption
Datacenter tax incentive
9.00¢/kWh
Commercial electricity
7.41¢/kWh
Industrial electricity
9
Fiber providers
High
Water stress
$8,684
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
49°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).
By site type
Top datacenter sites in Washington County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| GREEN VALLEY | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 63.6 |
| TAP206657 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 63.5 |
| EC Near Bloomington Power Plant | Greenfield | — | — | 1.7 yrs | 63.4 |
| TAP206312 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 63.3 |
| TAP206303 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 63.0 |
| UNKNOWN201442 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 62.9 |
| UNKNOWN206624 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 62.9 |
| EC Near Bloomington Power Plant | Greenfield | — | — | 1.7 yrs | 62.6 |
| SKYLINE | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 62.4 |
| EC Near Bloomington Power Plant | Greenfield | — | — | 1.7 yrs | 62.3 |
| TAP206608 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 62.3 |
| MILLCREEK | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.9 |
| TAP206553 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.4 |
| LEDGES | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.3 |
| EC Near Bloomington Power Plant | Greenfield | — | — | 1.7 yrs | 61.2 |
| UNKNOWN206551 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 60.8 |
| TAP206550 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 60.6 |
| EC Near Bloomington Power Plant | Greenfield | — | — | 1.7 yrs | 60.5 |
| UNKNOWN206626 | Substation-Adjacent | 161 kV | 100 MW | 6.9 yrs | 59.5 |
| UNKNOWN206627 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 59.4 |
| UNKNOWN206625 | Substation-Adjacent | 161 kV | 100 MW | 6.9 yrs | 59.3 |
| EAST RIDGE | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 59.2 |
| UNKNOWN209788 | Substation-Adjacent | 115 kV | 100 MW | 6.9 yrs | 59.2 |
| RED BUTTE | Substation-Adjacent | 345 kV | 600 MW | 6.9 yrs | 59.2 |
| TAP206772 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 59.2 |
Washington County datacenter FAQ
- How many datacenter sites are in Washington County?
- 127 scored datacenter candidate sites, averaging 60.0/100 DC Readiness.
- Does Washington County offer datacenter tax incentives?
- Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).
- What is the natural-hazard risk in Washington County?
- FEMA's National Risk Index rates Washington County as "Relatively Low" (score 15).
- What are industrial electricity rates in Washington County?
- Average industrial electricity is 7.41¢/kWh and commercial is 9.00¢/kWh in Washington County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Washington County, Utah. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.