EC Near US Magnesium

Greenfield

Tooele County, Utah · WECC

DC Readiness
47.5
Fair / 100

EC Near US Magnesium is a greenfield datacenter candidate site in Tooele County, Utah, interconnecting through WECC. It screens at 47.5/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPXO Salt Lake City IP PoP
IXP distance35.0 mi
Fiber providers6
Fiber coverage61.3%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance39.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerPACIFICORP
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone D
Water stress (WRI)3.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index86.7 (avg 100)

Location context

Nearest datacenterVoonami SLC2
DC distance35.5 mi
Nearest rail6.2 mi
Nearest gas pipeline32.9 mi
Nearest fiber route56.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,447

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
63
Energy cost10%
96
Water risk8%
18
Natural hazard8%
75
Buildability7%
5
Labor market4%
50
DC cluster4%
50
Land / acreage3%
50
Construction cost3%
78
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Tooele County, ranked by DC Readiness.

Sites near EC Near US Magnesium
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206148Substation-Adjacent115 kV100 MW1.7 yrs61.9
TAP206147Substation-Adjacent115 kV100 MW1.7 yrs61.2
UNKNOWN202985Substation-Adjacent115 kV100 MW1.7 yrs60.2
UNKNOWN202988Substation-Adjacent115 kV100 MW1.7 yrs60.0
TAP206145Substation-Adjacent115 kV100 MW1.7 yrs58.6
OZ TooeleGreenfield1.7 yrs58.2
UNKNOWN206146Substation-Adjacent115 kV100 MW1.7 yrs57.5
Greenfield (UNKNOWN202988 - UNKNOWN202984)Greenfield115 kV100 MW1.7 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near US Magnesium, Tooele County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.