Skip to content
Gridcensus

EC Near US Magnesium

Greenfield

Tooele County, Utah · WECC

DC Readiness
57.4
Good / 100

EC Near US Magnesium is a greenfield datacenter candidate site in Tooele County, Utah, interconnecting through WECC. It screens at 57.4/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.10¢/kWh

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionWECC
Queue depth34
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPXO Salt Lake City IP PoP
IXP distance39.8 mi
Fiber providers9
Fiber coverage67.8%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance44.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerPACIFICORP
Land contactTooele County Assessor
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone D
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index86.7 (avg 100)

Location context

Nearest datacenterVoonami SLC2
DC distance39.8 mi
Nearest rail1.1 mi
Nearest gas pipeline37.5 mi
Nearest fiber route110.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,447

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near US Magnesium

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
63
Fiber connectivity12%
66
Energy cost10%
96
Water risk7%
24
Natural hazard6%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
50
Land / acreage3%
51
Construction cost3%
78
Gas pipeline2%
0
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Tooele County, ranked by DC Readiness.

Sites near EC Near US Magnesium
SiteTypeVoltageCapacityQueue waitScore
EC Coal Tooele CountyGreenfield——1.7 yrs64.6
OZ TooeleGreenfield——1.7 yrs62.1
EC Near US MagnesiumGreenfield——1.7 yrs58.1
EC Near US MagnesiumGreenfield——1.7 yrs57.5
EC Near US MagnesiumGreenfield——1.7 yrs57.4
EC Near US MagnesiumGreenfield——1.7 yrs56.2
UNKNOWN202988Substation-Adjacent115 kV100 MW6.9 yrs55.5
TAP206145Substation-Adjacent115 kV100 MW6.9 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near US Magnesium, Tooele County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.