EC Coal Daggett County
GreenfieldDaggett County, Utah · WECC
EC Coal Daggett County is a greenfield datacenter candidate site in Daggett County, Utah, interconnecting through WECC. It screens at 56.8/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Daggett County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN205944 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 55.4 |
| TAP205943 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 55.4 |
| UNKNOWN202533 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 55.2 |
| LITTLE MOUNTAIN | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 53.3 |
| FLAMING GORGE | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 53.3 |
| UNKNOWN202529 | Substation-Adjacent | 69 kV | 50 MW | 6.9 yrs | 53.0 |
| UNKNOWN202537 | Substation-Adjacent | 138 kV | 100 MW | 6.9 yrs | 49.3 |
| Ellsworth Conoco Services | Industrial | — | — | 6.9 yrs | 47.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Coal Daggett County, Daggett County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.