Skip to content
Gridcensus

LITTLE MOUNTAIN

Substation-Adjacent

Daggett County, Wyoming · WECC

DC Readiness
58.1
Good / 100

LITTLE MOUNTAIN is a substation-adjacent datacenter candidate site in Daggett County, Wyoming, interconnecting through WECC. It screens at 58.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLITTLE MOUNTAIN
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance43.1 mi
Fiber providers2
Fiber coverage43.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterStrata Networks
DC distance43.1 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.00¢/kWh
Industrial electricity9.13¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,609

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track LITTLE MOUNTAIN

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
57
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Daggett County, ranked by DC Readiness.

Sites near LITTLE MOUNTAIN
SiteTypeVoltageCapacityQueue waitScore
FLAMING GORGESubstation-Adjacent230 kV300 MW6.9 yrs58.9
TAP205943Substation-Adjacent138 kV100 MW6.9 yrs58.4
UNKNOWN205944Substation-Adjacent138 kV100 MW6.9 yrs58.3
UNKNOWN202533Substation-Adjacent138 kV100 MW6.9 yrs58.1
EC Coal Daggett CountyGreenfield——1.7 yrs57.7
UNKNOWN202529Substation-Adjacent69 kV50 MW6.9 yrs56.0
UNKNOWN202537Substation-Adjacent138 kV100 MW6.9 yrs54.7
Old 3M MarketIndustrial——6.9 yrs48.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LITTLE MOUNTAIN, Daggett County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.