EC Coal Sullivan County

Greenfield

Sullivan County, Pennsylvania · PJM

DC Readiness
53.8
Fair / 100

EC Coal Sullivan County is a greenfield datacenter candidate site in Sullivan County, Pennsylvania, interconnecting through PJM. It screens at 53.8/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.12¢/kWh
UtilitySULLIVAN COUNTY R E C, INC - (PA)not available

Speed to power

Interconnection outlookFavorable
≈ 1.6 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXP70 Henry St
IXP distance48.4 mi
Fiber providers3
Fiber coverage29.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance179.5 mi

Site characteristics

Site typeGreenfield
Land contactSullivan County County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usecoal mine

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index67.6 (avg 100)

Location context

Nearest datacenterNautilus Cryptomine
DC distance32.1 mi
Nearest rail13.2 mi
Nearest gas pipeline14.4 mi
Nearest fiber route95.8 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.75¢/kWh
Industrial electricity7.95¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$4,619

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track EC Coal Sullivan County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
48
Energy cost10%
85
Water risk7%
90
Natural hazard6%
72
Buildability7%
45
Labor market4%
50
DC cluster4%
45
Land / acreage3%
42
Construction cost3%
94
Gas pipeline2%
54
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near EC Coal Sullivan County
SiteTypeVoltageCapacityQueue waitScore
GROVERSubstation-Adjacent230 kV300 MW3.8 yrs56.5
EC Coal Sullivan CountyGreenfield——3.0 yrs55.9
EC Coal Sullivan CountyGreenfield——3.0 yrs54.7
EC FFE Sullivan CountyGreenfield——3.0 yrs54.4
Mine SiteFormer Mine——3.8 yrs47.6
Mine SiteFormer Mine——3.8 yrs47.5
Mine SiteFormer Mine——3.8 yrs47.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Sullivan County, Sullivan County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.