Skip to content
Gridcensus

Mine Site

Former Mine

Sullivan County, Pennsylvania · PJM

DC Readiness
47.6
Fair / 100

Mine Site is a former mine datacenter candidate site in Sullivan County, Pennsylvania, interconnecting through PJM. It screens at 47.6/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityCLAVERACK RURAL ELEC COOP INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.8 yrs

Connectivity

Nearest IXP70 Henry St
IXP distance49.4 mi
Fiber providers3
Fiber coverage29.9%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterNautilus Cryptomine
DC distance28.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.75¢/kWh
Industrial electricity7.95¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$4,619

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
48
Energy cost10%
50
Water risk7%
90
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
GROVERSubstation-Adjacent230 kV300 MW3.8 yrs56.5
EC Coal Sullivan CountyGreenfield——3.0 yrs55.9
EC Coal Sullivan CountyGreenfield——3.0 yrs54.7
EC FFE Sullivan CountyGreenfield——3.0 yrs54.4
EC Coal Sullivan CountyGreenfield——3.0 yrs53.8
Mine SiteFormer Mine——3.8 yrs47.5
Mine SiteFormer Mine——3.8 yrs47.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Sullivan County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.