South Region at 44.032, -123.880

Federal Excess

Lane County, Oregon · WECC

DC Readiness
49.2
Fair / 100

At a glance

South Region at 44.032, -123.880 is a federal excess datacenter candidate site in Lane County, Oregon, scoring 49.2/100 DC Readiness — 132nd of 132 scored sites in the county. It sits in the WECC grid region and the CENTRAL LINCOLN PEOPLE'S UT DT service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityCENTRAL LINCOLN PEOPLE'S UT DTpolitical subdivision

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPData Center West Eugene
IXP distance39.1 mi
Fiber providers14
Fiber coverage43.4%
Max download26 Mbps

Site characteristics

Acreage19 ac
Buildable load (est.)~8–19 MWland-based
Former usePower Development and Distribution

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDate Center West - Eugene
DC distance39.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.47¢/kWh
Industrial electricity6.28¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$12,788

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track South Region

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does South Region at 44.032, -123.880 compare with other sites in Lane County?

South Region at 44.032, -123.880 ranks 132nd of 132 scored candidate sites in Lane County. Its 49.2/100 is about 14% below the county average of 57.1. It is roughly in line with the Oregon average of 53.1 and roughly in line with the national average of 53.2.

Against the Oregon average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is power availability (30 vs 40). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is South Region at 44.032, -123.880 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Data Center West Eugene at 39.1 miles. 14 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Date Center West - Eugene, 39.1 miles away.

What are the flood, water and hazard risks at South Region at 44.032, -123.880?

At the county level, FEMA's National Risk Index rates Lane County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
60
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
41
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lane County, ranked by DC Readiness.

Sites near South Region at 44.032, -123.880
SiteTypeVoltageCapacityQueue waitScore
ALVEYSubstation-Adjacent500 kV1,000 MW3.5 yrs68.5
LANESubstation-Adjacent500 kV1,000 MW3.5 yrs68.1
UNKNOWN202116Substation-Adjacent230 kV300 MW3.5 yrs65.1
DEAD HEADSubstation-Adjacent230 kV300 MW3.5 yrs65.0
OZ LaneGreenfield——3.5 yrs64.9
SeQuential Biodiesel SolarBrownfield115 kV0 MW3.5 yrs64.9
TAP203154Substation-Adjacent230 kV300 MW3.5 yrs63.8
MCKENZIESubstation-Adjacent230 kV300 MW3.5 yrs63.0

South Region at 44.032, -123.880: common questions

What is the DC Readiness score of South Region at 44.032, -123.880?

South Region at 44.032, -123.880 scores 49.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 132nd of 132 scored sites in Lane County. The Lane County average is 57.1 and the Oregon average is 53.1.

Which electric utility serves South Region at 44.032, -123.880?

CENTRAL LINCOLN PEOPLE'S UT DT (political subdivision) holds the retail service territory that contains the site.

What grid region is South Region at 44.032, -123.880 in?

South Region at 44.032, -123.880 is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is South Region at 44.032, -123.880 from an internet exchange?

The nearest internet exchange facility is Data Center West Eugene, about 39.1 miles away; 14 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “South Region at 44.032, -123.880, Lane County, OR”, https://gridcensus.com/datacenter-sites/oregon/lane-county/south-region-a5d9c61a (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for South Region at 44.032, -123.880, Lane County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.