Skip to content
Gridcensus

ROGUE RIVER PROJECT

Federal Excess

Jackson County, Oregon · WECC

DC Readiness
50.9
Fair / 100

ROGUE RIVER PROJECT is a federal excess datacenter candidate site in Jackson County, Oregon, interconnecting through WECC. It screens at 50.9/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPData Center West Medford
IXP distance23.3 mi
Fiber providers6
Fiber coverage41.3%

Site characteristics

Acreage513 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterData Center West Medford
DC distance23.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity6.22¢/kWh
Industrial electricity6.94¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$12,421

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
59
Energy cost10%
50
Water risk8%
60
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
66
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Jackson County, ranked by DC Readiness.

Sites near ROGUE RIVER PROJECT
SiteTypeVoltageCapacityQueue waitScore
MERIDIANSubstation-Adjacent500 kV1,000 MW6.9 yrs67.2
LONE PINE 230 KVSubstation-Adjacent230 kV300 MW6.9 yrs63.6
SAGE ROADSubstation-Adjacent115 kV100 MW6.9 yrs60.6
MEDFORDSubstation-Adjacent115 kV100 MW6.9 yrs60.5
EC FFE Jackson CountyGreenfield1.7 yrs60.5
TAP203642Substation-Adjacent115 kV100 MW6.9 yrs60.4
BEALL LANESubstation-Adjacent115 kV100 MW6.9 yrs60.2
BROOKHURSTSubstation-Adjacent115 kV100 MW6.9 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen