At a glance

Central Dock Co. is an industrial datacenter candidate site in Coos County, Oregon, scoring 51.4/100 DC Readiness — 60th of 84 scored sites in the county. It sits in the WECC grid region and the CENTRAL LINCOLN PEOPLE'S UT DT service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityCENTRAL LINCOLN PEOPLE'S UT DTpolitical subdivision

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPData Center West Eugene
IXP distance72.8 mi
Fiber providers7
Fiber coverage79.6%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score63/100

Location context

Nearest datacenterBandon CLS (AT&T)
DC distance12.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.16¢/kWh
Industrial electricity7.37¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$4,016

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Central Dock Co.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Central Dock Co. compare with other sites in Coos County?

Central Dock Co. ranks 60th of 84 scored candidate sites in Coos County. Its 51.4/100 is roughly in line with the county average of 53.5. It is roughly in line with the Oregon average of 53.1 and roughly in line with the national average of 53.2.

Against the Oregon average, its strongest sub-score is fiber connectivity (72 vs 66) and its weakest is natural hazard (63 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Central Dock Co. to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Data Center West Eugene at 72.8 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Bandon CLS (AT&T), 12.2 miles away.

What are the flood, water and hazard risks at Central Dock Co.?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. At the county level, FEMA's National Risk Index rates Coos County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
60
Natural hazard6%
63
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Coos County, ranked by DC Readiness.

Sites near Central Dock Co.
SiteTypeVoltageCapacityQueue waitScore
ISTHMUSSubstation-Adjacent230 kV300 MW3.5 yrs62.7
FAIRVIEWSubstation-Adjacent230 kV300 MW3.5 yrs61.4
TAHKENITCHSubstation-Adjacent230 kV300 MW3.5 yrs61.1
UNKNOWN202685Substation-Adjacent115 kV100 MW3.5 yrs58.3
STATE ST.Substation-Adjacent115 kV100 MW3.5 yrs58.3
COOS BAYSubstation-Adjacent115 kV100 MW3.5 yrs58.3
LOCKHARTSubstation-Adjacent115 kV100 MW3.5 yrs58.3
TAP203281Substation-Adjacent115 kV100 MW3.5 yrs58.2

Central Dock Co.: common questions

What is the DC Readiness score of Central Dock Co.?

Central Dock Co. scores 51.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 60th of 84 scored sites in Coos County. The Coos County average is 53.5 and the Oregon average is 53.1.

Which electric utility serves Central Dock Co.?

CENTRAL LINCOLN PEOPLE'S UT DT (political subdivision) holds the retail service territory that contains the site.

What grid region is Central Dock Co. in?

Central Dock Co. is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

Is Central Dock Co. in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

How far is Central Dock Co. from an internet exchange?

The nearest internet exchange facility is Data Center West Eugene, about 72.8 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Central Dock Co., Coos County, OR”, https://gridcensus.com/datacenter-sites/oregon/coos-county/central-dock-co-11420f96 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Central Dock Co., Coos County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.