OZ Richmond
GreenfieldRichmond, New York · NYISO
OZ Richmond is a greenfield datacenter candidate site in Richmond, New York, interconnecting through NYISO. It screens at 60.8/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Richmond, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| PSEG LINDEN GENERATING STATION | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 73.4 |
| SAYREVILLE | Substation-Adjacent | 500 kV | 1,000 MW | 3.5 yrs | 73.0 |
| SEWAREN | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 70.5 |
| TAP167289 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 69.9 |
| UNKNOWN132611 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 68.2 |
| Greenfield (DUFFY AVENUE CONVERTER STATION) | Greenfield | 500 kV | 1,000 MW | 3.5 yrs | 64.9 |
| PSEG Sewaren Generating Station | Brownfield | — | 567 MW | 2.6 yrs | 63.9 |
| FedEx Ground Distribution Hub | Brownfield | — | 2 MW | — | 63.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for OZ Richmond, Richmond. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.