UNKNOWN132611 is a substation-adjacent datacenter candidate site in Richmond, New Jersey, interconnecting through PJM. It screens at 69.9/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Richmond, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SEWAREN | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 70.0 |
| UNKNOWN129920 | Substation-Adjacent | 230 kV | 300 MW | 4.9 yrs | 67.5 |
| MINUE STREET | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 66.2 |
| Kessler Industries Solar | Brownfield | 230 kV | 1 MW | 3.8 yrs | 66.2 |
| TAP167289 | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.9 |
| White Rose Foods Solar | Brownfield | 230 kV | 5 MW | 3.8 yrs | 64.4 |
| OZ Richmond | Greenfield | — | — | 3.5 yrs | 62.3 |
| OZ Richmond | Greenfield | — | — | 3.5 yrs | 62.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN132611, Richmond. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.