Orange County has 45 scored datacenter candidate sites averaging 56.4/100 DC Readiness, with a catalogued aggregate of 6,002 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

45
Candidate sites
56.4/100
Avg DC Readiness
6,002 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Orange County

Site-selection context for Orange County

Yessales_tax_exemption
Datacenter tax incentive
11.68¢/kWh
Commercial electricity
7.59¢/kWh
Industrial electricity
12
Fiber providers
Low
Water stress
$10,494
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

By site type

Top datacenter sites in Orange County

Top datacenter sites in Orange County
SiteTypeVoltageCapacityQueue waitScore
ROCK TAVERNSubstation-Adjacent345 kV600 MW4.9 yrs63.3
Monroe Landfill SolarBrownfield2 MW4.9 yrs62.8
UNKNOWN158122Substation-Adjacent345 kV600 MW4.9 yrs62.3
OZ OrangeGreenfield3.5 yrs60.9
UNKNOWN129024Substation-Adjacent115 kV100 MW4.9 yrs59.7
UNKNOWN129109Substation-Adjacent115 kV100 MW4.9 yrs59.3
MODENASubstation-Adjacent115 kV100 MW4.9 yrs59.1
UNKNOWN129098Substation-Adjacent115 kV100 MW4.9 yrs58.8
UNKNOWN129097Substation-Adjacent115 kV100 MW4.9 yrs58.8
UNKNOWN129107Substation-Adjacent115 kV100 MW4.9 yrs58.7
ROCK TAVERN VSFederal Excess3.3 yrs56.3
TAP135950Substation-Adjacent138 kV100 MW4.9 yrs56.0
OZ OrangeGreenfield3.5 yrs55.6
UNKNOWN129110Substation-Adjacent138 kV100 MW4.9 yrs55.5
OZ OrangeGreenfield3.5 yrs55.3
Formisano propertyIndustrial4.9 yrs55.2
Quassaick Creek Estuary ClusterIndustrial4.9 yrs55.2
151 Liberty StreetIndustrial4.9 yrs55.2
UNKNOWN129106Substation-Adjacent138 kV100 MW4.9 yrs55.1
Diamond Candle FactoryIndustrial4.9 yrs55.1
SHOEMAKERSubstation-Adjacent138 kV100 MW4.9 yrs55.0
UNKNOWN129091Substation-Adjacent69 kV50 MW4.9 yrs54.3
HUGUENOT VORFederal Excess3.3 yrs53.7
Mine SiteFormer Mine4.9 yrs53.5
Mine SiteFormer Mine4.9 yrs53.4

Orange County datacenter FAQ

How many datacenter sites are in Orange County?
45 scored datacenter candidate sites, averaging 56.4/100 DC Readiness.
Does Orange County offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Orange County?
FEMA's National Risk Index rates Orange County as "Relatively High" (score 35).
What are industrial electricity rates in Orange County?
Average industrial electricity is 7.59¢/kWh and commercial is 11.68¢/kWh in Orange County.