Skip to content
Gridcensus

Orange County, New York · NYISO

DC Readiness
63.3
Good / 100

ROCK TAVERN is a substation-adjacent datacenter candidate site in Orange County, New York, interconnecting through NYISO. It screens at 63.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationROCK TAVERN
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityCENTRAL HUDSON GAS & ELEC CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPCyrusOne Wappingers Falls
IXP distance18.6 mi
Fiber providers12
Fiber coverage72.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterCyrusOne Wappingers Falls
DC distance18.6 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.68¢/kWh
Industrial electricity7.59¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$10,494

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ROCK TAVERN

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
38
Fiber connectivity12%
79
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near ROCK TAVERN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN158122Substation-Adjacent345 kV600 MW4.9 yrs62.9
Monroe Landfill SolarBrownfield—2 MW4.9 yrs60.9
OZ OrangeGreenfield——3.5 yrs59.8
UNKNOWN129109Substation-Adjacent115 kV100 MW4.9 yrs58.7
UNKNOWN129024Substation-Adjacent115 kV100 MW4.9 yrs58.6
UNKNOWN129107Substation-Adjacent115 kV100 MW4.9 yrs58.3
UNKNOWN129098Substation-Adjacent115 kV100 MW4.9 yrs58.2
UNKNOWN129097Substation-Adjacent115 kV100 MW4.9 yrs58.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROCK TAVERN, Orange County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.