LAGUARDIA RW-22 OM

Federal Excess

Bronx, New York · SPP

DC Readiness
58.1
Good / 100

LAGUARDIA RW-22 OM is a federal excess datacenter candidate site in Bronx, New York, interconnecting through SPP. It screens at 58.1/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityCONSOLIDATED EDISON CO-NY INCinvestor ownedrestrictive to large load · terms ≥ 20 MWStandby / large-load service; NYISO Zone J

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth1
Avg queue wait3.3 yrs

Connectivity

Nearest IXPCrown Castle White Plains (360 Hamilton)
IXP distance11.8 mi
Fiber providers10
Fiber coverage100.0%

Site characteristics

Acreage5 ac
Buildable load (est.)~2–5 MWland-based
Land contactBronx County County Assessor
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterDatacenter 802054282
DC distance7.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity19.58¢/kWh
Industrial electricity27.43¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$59,992

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track LAGUARDIA RW-22 OM

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
90
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Bronx, ranked by DC Readiness.

Sites near LAGUARDIA RW-22 OM
SiteTypeVoltageCapacityQueue waitScore
SPRAIN BROOKSubstation-Adjacent345 kV600 MW4.9 yrs66.6
DUNWOODIESubstation-Adjacent345 kV600 MW4.9 yrs66.5
OZ BronxGreenfield——3.5 yrs61.1
EC Near RiverbayGreenfield——3.5 yrs60.5
EAST 179TH STREETSubstation-Adjacent138 kV100 MW4.9 yrs59.9
TREMONTSubstation-Adjacent138 kV100 MW4.9 yrs59.8
EC Near RiverbayGreenfield——3.5 yrs59.2
Montefieor Medical Center Moses DivisionBrownfield—4 MW3.5 yrs59.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.