Burlington County, New Jersey · SPP

DC Readiness
40.5
Fair / 100

COYLE VOR is a federal excess datacenter candidate site in Burlington County, New Jersey, interconnecting through SPP. It screens at 40.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth31

Connectivity

Nearest IXPNJFX
IXP distance31.1 mi

Site characteristics

Acreage7 ac
Former useNavigation and Traffic Aids

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterApollo Cable Landing Station
DC distance29.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.16¢/kWh
Industrial electricity7.51¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$12,875

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
43
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Burlington County, ranked by DC Readiness.

Sites near COYLE VOR
SiteTypeVoltageCapacityQueue waitScore
LUMBERTONSubstation-Adjacent230 kV300 MW3.0 yrs71.2
EAST WINDSORSubstation-Adjacent500 kV1,000 MW3.0 yrs70.9
UNKNOWN132248Substation-Adjacent230 kV300 MW3.0 yrs70.1
Greenfield (EAST WINDSOR - NEW FREEDOM)Greenfield500 kV1,000 MW3.0 yrs67.0
Greenfield (EAST WINDSOR - NEW FREEDOM)Greenfield500 kV1,000 MW3.0 yrs66.6
Greenfield (EAST WINDSOR - NEW FREEDOM)Greenfield500 kV1,000 MW3.0 yrs65.5
Greenfield (UNKNOWN132248 - LUMBERTON)Greenfield230 kV300 MW3.0 yrs62.3
EC Coal Burlington CountyGreenfield2.6 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen