EC Near PSEG Burlington Generating Station
GreenfieldBurlington County, New Jersey · PJM
EC Near PSEG Burlington Generating Station is a greenfield datacenter candidate site in Burlington County, New Jersey, interconnecting through PJM. It screens at 60.5/100 DC Readiness and a 2.6 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Burlington County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Burlington County | Greenfield | — | — | 2.6 yrs | 61.7 |
| EC Coal Burlington County | Greenfield | — | — | 2.6 yrs | 61.6 |
| OZ Burlington | Greenfield | — | — | 2.6 yrs | 61.3 |
| OZ Burlington | Greenfield | — | — | 2.6 yrs | 61.2 |
| UNKNOWN132248 | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 59.8 |
| EC Near PSEG Burlington Generating Station | Greenfield | — | — | 2.6 yrs | 59.5 |
| EC Near PSEG Burlington Generating Station | Greenfield | — | — | 2.6 yrs | 58.9 |
| OZ Burlington | Greenfield | — | — | 2.6 yrs | 58.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near PSEG Burlington Generating Station, Burlington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.