Humbold Project is a federal excess datacenter candidate site in Lander, Nevada, interconnecting through SPP. It screens at 46.9/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilitySIERRA PACIFIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWClean Transition Tariff (large loads)

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth35
Avg queue wait3.3 yrs

Connectivity

Nearest IXPSwitch Tahoe Reno
IXP distance154.7 mi
Fiber providers1
Fiber coverage35.5%

Site characteristics

Acreage640 ac
Buildable load (est.)~256–640 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterTesla Gigafactory
DC distance152.6 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity5.83¢/kWh
Industrial electricity5.01¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$1,115

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Humbold Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
69
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Lander, ranked by DC Readiness.

Sites near Humbold Project
SiteTypeVoltageCapacityQueue waitScore
FRONTIERSubstation-Adjacent230 kV300 MW6.9 yrs56.0
AUSTINSubstation-Adjacent230 kV300 MW6.9 yrs55.0
EC Near Battle MountainGreenfield——5.8 yrs54.6
EC Near Battle MountainGreenfield——5.8 yrs54.4
EC Near Battle MountainGreenfield——5.8 yrs54.3
EC Near Battle MountainGreenfield——5.8 yrs54.0
Battle MountainBrownfield120 kV8 MW5.8 yrs53.7
EC Near Battle MountainGreenfield——5.8 yrs52.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Humbold Project, Lander. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.