Greenfield (UNKNOWN131628 - RAUN)

Greenfield

Burt County, Nebraska · SPP

DC Readiness
47.6
Fair / 100

Greenfield (UNKNOWN131628 - RAUN) is a greenfield datacenter candidate site in Burt County, Nebraska, interconnecting through SPP. It screens at 47.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN131628
Nearest grid bottleneckTP1177_32125 · 131 km (SPP)
Substation voltage161 kV
Available capacity100 MW
UtilityOMAHA PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLong Lines Secure Data Center
IXP distance39.3 mi
Fiber providers8
Fiber coverage46.5%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterLong Lines Secure Data Center
DC distance39.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.36¢/kWh
Industrial electricity4.52¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$7,150

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN131628 - RAUN)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power20%
33
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Burt County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN131628 - RAUN)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131628Substation-Adjacent161 kV100 MW3.3 yrs53.8
UNKNOWN131759Substation-Adjacent115 kV100 MW3.3 yrs53.7
Tiger BowlIndustrial——3.3 yrs47.9
Tekamah Industrial SiteIndustrial——3.3 yrs47.8
Greenfield (UNKNOWN131759 - UNKNOWN131760)Greenfield115 kV100 MW3.3 yrs47.5
Oakland Industrial SiteIndustrial——3.3 yrs47.5
Mine SiteFormer Mine——3.3 yrs47.1
Old Medicine Chest BuildingIndustrial——3.3 yrs46.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN131628 - RAUN), Burt County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.