Tekamah Industrial Site

Industrial

Burt County, Nebraska · SPP

DC Readiness
49.6
Fair / 100

Tekamah Industrial Site is an industrial datacenter candidate site in Burt County, Nebraska, interconnecting through SPP. It screens at 49.6/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTP1177_32125 · 118 km (SPP)
UtilityOMAHA PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPScott Data Center Omaha
IXP distance37.4 mi
Fiber providers8
Fiber coverage46.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterGoogle
DC distance29.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.36¢/kWh
Industrial electricity4.52¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$7,150

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Tekamah Industrial Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Burt County, ranked by DC Readiness.

Sites near Tekamah Industrial Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131628Substation-Adjacent161 kV100 MW3.3 yrs55.6
UNKNOWN131759Substation-Adjacent115 kV100 MW3.3 yrs55.5
Tiger BowlIndustrial——3.3 yrs49.7
Oakland Industrial SiteIndustrial——3.3 yrs49.3
Greenfield (UNKNOWN131628 - RAUN)Greenfield161 kV100 MW3.3 yrs49.3
Greenfield (UNKNOWN131759 - UNKNOWN131760)Greenfield115 kV100 MW3.3 yrs49.3
Mine SiteFormer Mine——3.3 yrs48.9
Old Medicine Chest BuildingIndustrial——3.3 yrs48.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.