Tekamah Industrial Site

Industrial

Burt County, Nebraska · SPP

DC Readiness
37.3
Limited / 100

Tekamah Industrial Site is a industrial datacenter candidate site in Burt County, Nebraska, interconnecting through SPP. It screens at 37.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth31

Connectivity

Nearest IXPScott Data Center Omaha
IXP distance37.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterGoogle
DC distance29.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.36¢/kWh
Industrial electricity4.52¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$7,150

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Burt County, ranked by DC Readiness.

Sites near Tekamah Industrial Site
SiteTypeVoltageCapacityQueue waitScore
Greenfield (RAUN - FORT CALHOUN)Greenfield345 kV600 MW3.5 yrs64.6
Greenfield (RAUN - FORT CALHOUN)Greenfield345 kV600 MW3.5 yrs63.5
UNKNOWN131759Substation-Adjacent115 kV100 MW3.5 yrs63.2
Greenfield (RAUN - FORT CALHOUN)Greenfield345 kV600 MW3.5 yrs63.1
Greenfield (RAUN - FORT CALHOUN)Greenfield345 kV600 MW3.5 yrs62.4
UNKNOWN131760Substation-Adjacent115 kV100 MW3.5 yrs61.9
UNKNOWN131628Substation-Adjacent161 kV100 MW3.5 yrs61.9
Greenfield (UNKNOWN131628 - UNKNOWN132488)Greenfield161 kV100 MW3.5 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.