USDA SEDIMENTATION LABORATORY

Federal Excess

PANOLA, Mississippi · PJM

DC Readiness
50.3
Fair / 100

USDA SEDIMENTATION LABORATORY is a federal excess datacenter candidate site in PANOLA, Mississippi, interconnecting through PJM. It screens at 50.3/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance54.9 mi
Fiber providers3
Fiber coverage77.4%
Max download5 Mbps

Site characteristics

Acreage198 ac
Land contactPanola County County Assessor
Former useResearch and Development

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterxAI Macrohardrr
DC distance53.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity7.22¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,142

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
45
Fiber connectivity12%
67
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
65
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in PANOLA, ranked by DC Readiness.

Sites near USDA SEDIMENTATION LABORATORY
SiteTypeVoltageCapacityQueue waitScore
EC Near Batesville Generation FacilityGreenfield1.4 yrs61.5
EC Near Batesville Generation FacilityGreenfield1.4 yrs61.3
EC Near Batesville Generation FacilityGreenfield1.4 yrs60.9
EC Near Batesville Generation FacilityGreenfield1.4 yrs60.4
EC Near Batesville Generation FacilityGreenfield1.4 yrs60.2
UNKNOWN110928Substation-Adjacent230 kV300 MW2.8 yrs59.5
EC FFE Panola CountyGreenfield1.4 yrs59.2
EC Near Batesville Generation FacilityGreenfield1.4 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for USDA SEDIMENTATION LABORATORY, PANOLA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.