UNKNOWN110928
Substation-AdjacentPANOLA, Mississippi · MISO
UNKNOWN110928 is a substation-adjacent datacenter candidate site in PANOLA, Mississippi, interconnecting through MISO. It screens at 59.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in PANOLA, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 61.5 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 61.3 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 60.9 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 60.4 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 60.2 |
| EC FFE Panola County | Greenfield | — | — | 1.4 yrs | 59.2 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 58.5 |
| EC Near Batesville Generation Facility | Greenfield | — | — | 1.4 yrs | 58.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN110928, PANOLA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.