EC Near Fergus Control Ctr

Greenfield

Otter Tail, Minnesota · MISO

DC Readiness
56.8
Good / 100

EC Near Fergus Control Ctr is a greenfield datacenter candidate site in Otter Tail, Minnesota, interconnecting through MISO. It screens at 56.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.10¢/kWh
UtilityOTTER TAIL POWER COinvestor owned

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDCN Dakota Carrier Networks
IXP distance56.5 mi
Fiber providers13
Fiber coverage59.1%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance335.2 mi

Site characteristics

Site typeGreenfield
Land contactOtter Tail County Assessor
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index109.6 (avg 100)

Location context

Nearest datacenterDakota Carrier Network
DC distance56.7 mi
Nearest rail4.3 mi
Nearest gas pipeline26.7 mi
Nearest fiber route38.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.31¢/kWh
Industrial electricity10.03¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,840

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Fergus Control Ctr

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
64
Energy cost10%
87
Water risk7%
88
Natural hazard6%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
59
Gas pipeline2%
14
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Otter Tail, ranked by DC Readiness.

Sites near EC Near Fergus Control Ctr
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130155Substation-Adjacent230 kV300 MW2.8 yrs61.2
UNKNOWN129803Substation-Adjacent230 kV300 MW2.8 yrs60.5
UNKNOWN171144Substation-Adjacent230 kV300 MW2.8 yrs60.4
UNKNOWN129810Substation-Adjacent230 kV300 MW2.8 yrs60.4
UNKNOWN130217Substation-Adjacent115 kV100 MW2.8 yrs58.5
EC Near Hoot LakeGreenfield——1.4 yrs57.7
UNKNOWN129798Substation-Adjacent115 kV100 MW2.8 yrs57.0
EC Near Hoot LakeGreenfield——1.4 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.