Datacenter Sites in Otter Tail, Minnesota
Otter Tail has 39 scored datacenter candidate sites averaging 57.7/100 DC Readiness, with a catalogued aggregate of 3,502 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
39
Candidate sites
57.7/100
Avg DC Readiness
3,502 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Otter Tail
Yessales_tax_exemption
Datacenter tax incentive
10.31¢/kWh
Commercial electricity
10.03¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$3,840
Land price / acre
600
Cooling degree days
7,700
Heating degree days
42°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
By site type
Top datacenter sites in Otter Tail
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN171144 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 70.0 |
| HOOT LAKE | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 68.3 |
| TAP171146 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 67.9 |
| Greenfield (UNKNOWN133416 - ARROWHEAD) | Greenfield | 250 kV | 300 MW | 1.4 yrs | 67.4 |
| UNKNOWN130796 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 67.1 |
| TAP135306 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 66.7 |
| UNKNOWN129803 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 66.0 |
| Greenfield (UNKNOWN129803 - UNKNOWN171144) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 65.4 |
| UNKNOWN130155 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 65.1 |
| UNKNOWN129798 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.6 |
| UNKNOWN130152 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.9 |
| UNKNOWN129810 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 63.4 |
| UNKNOWN129786 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.0 |
| UNKNOWN131333 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.0 |
| UNKNOWN136180 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 61.7 |
| Greenfield (UNKNOWN129810 - WING RIVER) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 61.1 |
| Greenfield (UNKNOWN136180 - TAP170792) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 60.9 |
| EC Near Hoot Lake | Greenfield | — | — | 1.4 yrs | 60.5 |
| Greenfield (UNKNOWN129810 - UNKNOWN131333) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 60.2 |
| Greenfield (UNKNOWN129803 - UNKNOWN171144) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 59.8 |
| EC Near Hoot Lake | Greenfield | — | — | 1.4 yrs | 59.7 |
| EC Near Fergus Control Ctr | Greenfield | — | — | 1.4 yrs | 59.5 |
| EC Near Hoot Lake | Greenfield | — | — | 1.4 yrs | 59.4 |
| Fergus Control Ctr | Brownfield | — | 2 MW | 1.4 yrs | 58.8 |
| EC Near Hoot Lake | Greenfield | — | — | 1.4 yrs | 58.6 |
Otter Tail datacenter FAQ
- How many datacenter sites are in Otter Tail?
- 39 scored datacenter candidate sites, averaging 57.7/100 DC Readiness.
- Does Otter Tail offer datacenter tax incentives?
- Sales tax exemption on DC equipment and electricity for qualified DCs.
- What is the natural-hazard risk in Otter Tail?
- FEMA's National Risk Index rates Otter Tail as "Relatively Moderate" (score 25).
- What are industrial electricity rates in Otter Tail?
- Average industrial electricity is 10.03¢/kWh and commercial is 10.31¢/kWh in Otter Tail.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Otter Tail, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.