EC Near Hutchinson Plant #1

Greenfield

McLeod, Minnesota · MISO

DC Readiness
53.8
Fair / 100

At a glance

EC Near Hutchinson Plant #1 is a greenfield datacenter candidate site in McLeod, Minnesota, scoring 53.8/100 DC Readiness — 30th of 38 scored sites in the county. It sits in the MISO grid region and the MCLEOD COOPERATIVE POWER ASSN service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh
UtilityMCLEOD COOPERATIVE POWER ASSNnot available

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth127
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPNP Belle Plaine (MSP1)
IXP distance39.9 mi
Fiber providers11
Fiber coverage57.2%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance220.0 mi

Site characteristics

Site typeGreenfield
Land contactMcLeod County Assessor
Land owner typeprivate
Buildability20.0/100
Land cover (NLCD)Emergent Herbaceous Wetlands
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index109.6 (avg 100)

Location context

Nearest datacenterNP Belle Plaine (MSP1)
DC distance39.9 mi
Nearest rail4.1 mi
Nearest gas pipeline5.7 mi
Nearest fiber route106.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.72¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$7,217

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Hutchinson Plant #1

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Hutchinson Plant #1 compare with other sites in McLeod?

EC Near Hutchinson Plant #1 ranks 30th of 38 scored candidate sites in McLeod. Its 53.8/100 is roughly in line with the county average of 56.0. It is roughly in line with the Minnesota average of 55.7 and roughly in line with the national average of 53.2.

Against the Minnesota average, its strongest sub-score is speed to power (48 vs 49) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Hutchinson Plant #1 to power, fiber and other datacenters?

The nearest located transmission bottleneck is West_Memphis_AT1_161_500kV_flo_Sans_Souci_Driver (MISO), 54 miles away. For connectivity, the nearest internet exchange facility is NP Belle Plaine (MSP1) at 39.9 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is NP Belle Plaine (MSP1), 39.9 miles away.

What are the flood, water and hazard risks at EC Near Hutchinson Plant #1?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.40 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates McLeod "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
64
Energy cost10%
87
Water risk7%
89
Natural hazard6%
65
Buildability7%
20
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
59
Gas pipeline2%
82
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in McLeod, ranked by DC Readiness.

Sites near EC Near Hutchinson Plant #1
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129735Substation-Adjacent230 kV300 MW4.3 yrs62.4
EC Near GlencoeGreenfield——4.3 yrs61.1
EC Near GlencoeGreenfield——4.3 yrs60.5
Hutchinson LandfillBrownfield69 kV0 MW4.3 yrs59.7
EC Near GlencoeGreenfield——4.3 yrs59.3
EC Near GlencoeGreenfield——4.3 yrs59.3
EC Near Hutchinson Plant #1Greenfield——4.3 yrs59.1
EC Near GlencoeGreenfield——4.3 yrs58.0

EC Near Hutchinson Plant #1: common questions

What is the DC Readiness score of EC Near Hutchinson Plant #1?

EC Near Hutchinson Plant #1 scores 53.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 30th of 38 scored sites in McLeod. The McLeod average is 56.0 and the Minnesota average is 55.7.

Which electric utility serves EC Near Hutchinson Plant #1?

MCLEOD COOPERATIVE POWER ASSN (not available) holds the retail service territory that contains the site.

What grid region is EC Near Hutchinson Plant #1 in?

EC Near Hutchinson Plant #1 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Hutchinson Plant #1 in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Hutchinson Plant #1?

Parcel records list the owner as NORTHERN STATES POWER CO - MINNESOTA (private land).

How far is EC Near Hutchinson Plant #1 from an internet exchange?

The nearest internet exchange facility is NP Belle Plaine (MSP1), about 39.9 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Hutchinson Plant #1, McLeod, MN”, https://gridcensus.com/datacenter-sites/minnesota/mcleod/ec-near-hutchinson-plant-1-f28ceaf6 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Hutchinson Plant #1, McLeod is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.