DC Readiness
51.0
Fair / 100

OZ Roscommon is a greenfield datacenter candidate site in Roscommon County, Michigan, interconnecting through PJM. It screens at 51.0/100 DC Readiness and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.10¢/kWh
UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 2.2 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth17
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLiquid Web DC3
IXP distance111.3 mi
Fiber providers7
Fiber coverage9.0%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance222.8 mi

Site characteristics

Site typeGreenfield
Land contactRoscommon County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone A (SFHA)
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score50/100
Construction cost index75.7 (avg 100)

Location context

Nearest datacenterDatacenter 755540694
DC distance104.7 mi
Nearest rail14.1 mi
Nearest gas pipeline6.8 mi
Nearest fiber route6.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.55¢/kWh
Industrial electricity4.95¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,073

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Roscommon

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
43
Energy cost10%
82
Water risk7%
94
Natural hazard6%
50
Buildability7%
5
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
87
Gas pipeline2%
78
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Roscommon County, ranked by DC Readiness.

Sites near OZ Roscommon
SiteTypeVoltageCapacityQueue waitScore
OZ RoscommonGreenfield——2.2 yrs56.5
UNKNOWN128347Substation-Adjacent138 kV100 MW3.8 yrs55.9
TAP155871Substation-Adjacent138 kV100 MW3.8 yrs55.6
Residential HouseIndustrial——3.8 yrs50.0
Former Roscommon County Road Commission OfficeIndustrial——3.8 yrs50.0
Dognut HoleIndustrial——3.8 yrs50.0
Irwin PropertyIndustrial——3.8 yrs50.0
Greenfield (UNKNOWN128347 - TAP145650)Greenfield138 kV100 MW3.8 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Roscommon, Roscommon County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.