Former Roscommon County Road Commission Office

Industrial

Roscommon County, Michigan · PJM

DC Readiness
47.1
Fair / 100

Former Roscommon County Road Commission Office is an industrial datacenter candidate site in Roscommon County, Michigan, interconnecting through PJM. It screens at 47.1/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityDTE ELECTRIC COMPANYinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLiquid Web DC3
IXP distance123.7 mi
Fiber providers7
Fiber coverage9.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 755540694
DC distance112.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.55¢/kWh
Industrial electricity4.95¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,073

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Roscommon County Road Commission Office

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Roscommon County, ranked by DC Readiness.

Sites near Former Roscommon County Road Commission Office
SiteTypeVoltageCapacityQueue waitScore
OZ RoscommonGreenfield——2.2 yrs53.4
UNKNOWN128347Substation-Adjacent138 kV100 MW3.8 yrs53.0
TAP155871Substation-Adjacent138 kV100 MW3.8 yrs52.6
OZ RoscommonGreenfield——2.2 yrs48.4
Dognut HoleIndustrial——3.8 yrs47.1
Residential HouseIndustrial——3.8 yrs47.1
Irwin PropertyIndustrial——3.8 yrs47.1
Greenfield (UNKNOWN128347 - TAP145650)Greenfield138 kV100 MW3.8 yrs46.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.