Skip to content
Gridcensus

Buckeye Products Sites

Industrial

Lenawee County, Michigan · PJM

DC Readiness
54.0
Fair / 100

Buckeye Products Sites is an industrial datacenter candidate site in Lenawee County, Michigan, interconnecting through PJM. It screens at 54.0/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSynergy Fiber
IXP distance28.6 mi
Fiber providers13
Fiber coverage72.7%

Site characteristics

Site typeIndustrial

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 11815482844
DC distance21.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity4.61¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$5,766

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
41
Fiber connectivity12%
73
Energy cost10%
50
Water risk8%
94
Natural hazard8%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Lenawee County, ranked by DC Readiness.

Sites near Buckeye Products Sites
SiteTypeVoltageCapacityQueue waitScore
EC FFE Lenawee CountyGreenfield2.2 yrs64.8
TAP137295Substation-Adjacent138 kV100 MW3.8 yrs59.4
UNKNOWN130371Substation-Adjacent138 kV100 MW3.8 yrs58.5
Greenfield (ALLEN JUNCTION - UNKNOWN171366)Greenfield345 kV600 MW3.8 yrs58.4
TAP140010Substation-Adjacent138 kV100 MW3.8 yrs57.9
MOROCCOSubstation-Adjacent138 kV100 MW3.8 yrs57.3
BEECHERSubstation-Adjacent138 kV100 MW3.8 yrs56.9
UNKNOWN172452Substation-Adjacent138 kV100 MW3.8 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Buckeye Products Sites, Lenawee County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.