Greenfield (ALLEN JUNCTION - UNKNOWN171366)
GreenfieldLenawee County, Ohio · PJM
Greenfield (ALLEN JUNCTION - UNKNOWN171366) is a greenfield datacenter candidate site in Lenawee County, Ohio, interconnecting through PJM. It screens at 57.7/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.
AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
Site location
Get alerts
Track Greenfield (ALLEN JUNCTION - UNKNOWN171366)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Lenawee County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Lenawee County | Greenfield | — | — | 2.2 yrs | 61.9 |
| TAP137295 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.4 |
| UNKNOWN130371 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.2 |
| TAP140010 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.1 |
| MOROCCO | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.1 |
| BEECHER | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.4 |
| UNKNOWN172452 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.4 |
| UNKNOWN130222 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.