Skip to content
Gridcensus

Greenfield (ALLEN JUNCTION - UNKNOWN171366)

Greenfield

Lenawee County, Ohio · PJM

DC Readiness
57.7
Good / 100

Greenfield (ALLEN JUNCTION - UNKNOWN171366) is a greenfield datacenter candidate site in Lenawee County, Ohio, interconnecting through PJM. It screens at 57.7/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationALLEN JUNCTION
Substation voltage345 kV
Available capacity600 MW
UtilityTHE TOLEDO EDISON COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPAmplex DC0
IXP distance25.2 mi
Fiber providers13
Fiber coverage72.7%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 11815482844
DC distance11.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity4.61¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$5,766

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (ALLEN JUNCTION - UNKNOWN171366)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power20%
37
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Lenawee County, ranked by DC Readiness.

Sites near Greenfield (ALLEN JUNCTION - UNKNOWN171366)
SiteTypeVoltageCapacityQueue waitScore
EC FFE Lenawee CountyGreenfield——2.2 yrs61.9
TAP137295Substation-Adjacent138 kV100 MW3.8 yrs58.4
UNKNOWN130371Substation-Adjacent138 kV100 MW3.8 yrs58.2
TAP140010Substation-Adjacent138 kV100 MW3.8 yrs58.1
MOROCCOSubstation-Adjacent138 kV100 MW3.8 yrs58.1
BEECHERSubstation-Adjacent138 kV100 MW3.8 yrs57.4
UNKNOWN172452Substation-Adjacent138 kV100 MW3.8 yrs57.4
UNKNOWN130222Substation-Adjacent138 kV100 MW3.8 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (ALLEN JUNCTION - UNKNOWN171366), Lenawee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.