Everett Solar Power Project is a brownfield datacenter candidate site in Suffolk County, Massachusetts, interconnecting through ISO-NE. It screens at 61.8/100 DC Readiness with a catalogued 1 MW of candidate capacity.

Power & interconnection

Substation distance0.8 mi
Available capacity1 MW
Utility commercial rate0.18¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32

Connectivity

Nearest IXPExpedient Boston
IXP distance1.1 mi
Fiber providers10
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance409.0 mi

Site characteristics

Site typeBrownfield
Acreage3 ac
Land owner typeprivate
Buildability75.0/100
Former usepower_plant
Existing capacity1 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSALS CLEANERS
Hazard sub-score68/100
Construction cost index164.7 (avg 100)

Location context

Nearest datacenterExpedient Boston
DC distance1.1 mi
Nearest rail0.4 mi
Nearest gas pipeline2.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity17.62¢/kWh
Industrial electricity16.73¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$52,340

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
31
Fiber connectivity12%
99
Energy cost10%
73
Water risk8%
93
Natural hazard8%
68
Buildability7%
75
Labor market4%
50
DC cluster4%
100
Land / acreage3%
25
Construction cost3%
13
Gas pipeline2%
91
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Suffolk County, ranked by DC Readiness.

Sites near Everett Solar Power Project
SiteTypeVoltageCapacityQueue waitScore
KINGSTON STREETSubstation-Adjacent345 kV600 MW3.5 yrs72.2
K STREETSubstation-Adjacent345 kV600 MW3.5 yrs71.1
NORTH CAMBRIDGESubstation-Adjacent345 kV600 MW3.5 yrs70.6
GOLDEN HILLSSubstation-Adjacent345 kV600 MW3.5 yrs70.4
MYSTICSubstation-Adjacent345 kV600 MW3.5 yrs70.1
WAKEFIELD JUNCTIONSubstation-Adjacent345 kV600 MW3.5 yrs69.5
Mystic Generating StationBrownfield2,844 MW3.5 yrs66.9
WOBURNSubstation-Adjacent345 kV600 MW3.5 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.