EC Near Cabot Holyoke

Greenfield

Hampden County, Massachusetts · ISO-NE

DC Readiness
58.2
Good / 100

EC Near Cabot Holyoke is a greenfield datacenter candidate site in Hampden County, Massachusetts, interconnecting through ISO-NE. It screens at 58.2/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.17¢/kWh
UtilityCITY OF CHICOPEE - (MA)municipal

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth25
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPCogent Springfield MA
IXP distance6.3 mi
Fiber providers10
Fiber coverage32.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance338.5 mi

Site characteristics

Site typeGreenfield
Land contactHampden County Assessor
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usenear retired gas plant (5km)

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteGUARDAIR CORP
Hazard sub-score68/100
Construction cost index124.3 (avg 100)

Location context

Nearest datacenterCogent Springfield MA
DC distance6.3 mi
Nearest rail2.6 mi
Nearest gas pipeline4.7 mi
Nearest fiber route36.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.80¢/kWh
Industrial electricity15.72¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$13,611

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Cabot Holyoke

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
78
Energy cost10%
58
Water risk7%
92
Natural hazard6%
68
Buildability7%
95
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
46
Gas pipeline2%
85
Tax incentive1%
0
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Hampden County, ranked by DC Readiness.

Sites near EC Near Cabot Holyoke
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133485Substation-Adjacent345 kV600 MW3.9 yrs67.3
AGAWAMSubstation-Adjacent345 kV600 MW3.9 yrs64.2
LUDLOWSubstation-Adjacent345 kV600 MW3.9 yrs62.6
Indian Orchard Solar FacilityBrownfield—2 MW3.9 yrs60.4
Greenfield (LUDLOW - BARBOUR HILL)Greenfield345 kV600 MW6.9 yrs59.9
OZ HampdenGreenfield——3.5 yrs59.8
EC Near Chicopee ElectricGreenfield——3.5 yrs59.5
OZ HampdenGreenfield——3.5 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Cabot Holyoke, Hampden County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.