Skip to content
Gridcensus

EC Coal Essex County

Greenfield

Essex County, Massachusetts · ISO-NE

DC Readiness
55.4
Good / 100

At a glance

EC Coal Essex County is a greenfield datacenter candidate site in Essex County, Massachusetts, scoring 55.4/100 DC Readiness — 31st of 216 scored sites in the county. It sits in the ISO-NE grid region, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.16¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth25
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPEXA CLS Lynn
IXP distance9.8 mi
Fiber providers8
Fiber coverage58.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance424.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerReeve J Stanley
Land contactEssex County County Assessor
Land owner typeprivate
Buildability50.0/100
Land cover (NLCD)Mixed Forest
Former usecoal adjacent

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund site11 PAINE AVENUE
Hazard sub-score68/100
Construction cost index117.0 (avg 100)

Location context

Nearest datacenterEXA CLS Lynn
DC distance9.8 mi
Nearest rail0.3 mi
Nearest gas pipeline2.7 mi
Nearest fiber route36.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.43¢/kWh
Industrial electricity16.09¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$20,111

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Essex County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Coal Essex County compare with other sites in Essex County?

EC Coal Essex County ranks 31st of 216 scored candidate sites in Essex County. Its 55.4/100 is roughly in line with the county average of 54.5. It is roughly in line with the Massachusetts average of 54.2 and roughly in line with the national average of 53.2.

Against the Massachusetts average, its strongest sub-score is fiber connectivity (81 vs 79) and its weakest is natural hazard (68 vs 76). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Coal Essex County to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is EXA CLS Lynn at 9.8 miles. 8 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is EXA CLS Lynn, 9.8 miles away.

What are the flood, water and hazard risks at EC Coal Essex County?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.60 on a 0–5 scale. No mapped wetlands are recorded on the parcel. A Superfund site is nearby (11 PAINE AVENUE). At the county level, FEMA's National Risk Index rates Essex County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
81
Energy cost10%
63
Water risk7%
88
Natural hazard6%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
53
Gas pipeline2%
91
Tax incentive1%
0
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Essex County, ranked by DC Readiness.

Sites near EC Coal Essex County
SiteTypeVoltageCapacityQueue waitScore
WARD HILLSubstation-Adjacent345 kV600 MW4.3 yrs65.9
UNKNOWN136229Substation-Adjacent115 kV100 MW4.3 yrs64.0
Old Groveland Rd. Landfill SolarBrownfield—3 MW4.3 yrs62.5
Huntington Avenue LandfillBrownfield115 kV1 MW4.3 yrs61.9
OZ EssexGreenfield——4.3 yrs61.5
TAP140678Substation-Adjacent115 kV100 MW4.3 yrs60.9
SOUTH BROADWAYSubstation-Adjacent115 kV100 MW4.3 yrs60.9
Greenfield (WAKEFIELD JUNCTION - TEWKSBURY)Greenfield345 kV600 MW4.3 yrs60.9

EC Coal Essex County: common questions

What is the DC Readiness score of EC Coal Essex County?

EC Coal Essex County scores 55.4/100 on the GridCensus DC Readiness scale, rated good. It ranks 31st of 216 scored sites in Essex County. The Essex County average is 54.5 and the Massachusetts average is 54.2.

What grid region is EC Coal Essex County in?

EC Coal Essex County is in the ISO-NE region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Coal Essex County in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Coal Essex County?

Parcel records list the owner as Reeve J Stanley (private land).

How far is EC Coal Essex County from an internet exchange?

The nearest internet exchange facility is EXA CLS Lynn, about 9.8 miles away; 8 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Coal Essex County, Essex County, MA”, https://gridcensus.com/datacenter-sites/massachusetts/essex-county/ec-coal-essex-county-4c90cb78 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Coal Essex County, Essex County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.