Mansfield Mill

Brownfield

Red River Parish, Louisiana · MISO

DC Readiness
55.3
Good / 100

Mansfield Mill is a brownfield datacenter candidate site in Red River Parish, Louisiana, interconnecting through MISO. It screens at 55.3/100 DC Readiness with a catalogued 25 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Substation distance8.5 mi
Substation voltage230 kV
Available capacity25 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance26.9 mi
Fiber providers1
Fiber coverage23.5%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance193.7 mi

Site characteristics

Site typeBrownfield
Parcel ownerIPC-Mansfield Mill
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usegas
Existing capacity25 MW
Retirement date2019-05-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index83.6 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance26.9 mi
Nearest rail0.3 mi
Nearest gas pipeline0.4 mi
Nearest fiber route78.4 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.12¢/kWh
Industrial electricity7.54¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$2,663

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
16
Speed to power15%
47
Fiber connectivity12%
58
Energy cost10%
88
Water risk8%
78
Natural hazard8%
42
Buildability7%
100
Labor market4%
50
DC cluster4%
60
Land / acreage3%
60
Construction cost3%
80
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Red River Parish, ranked by DC Readiness.

Sites near Mansfield Mill
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157576Substation-Adjacent500 kV1,000 MW1.4 yrs69.7
UNKNOWN112571Substation-Adjacent230 kV300 MW1.4 yrs66.7
UNKNOWN157576Substation-Adjacent500 kV1,000 MW3.4 yrs65.4
CARROLLSubstation-Adjacent230 kV300 MW3.4 yrs65.3
Greenfield (MOUNT OLIVE - UNKNOWN157576)Greenfield500 kV1,000 MW1.4 yrs63.7
INTERNATIONAL PAPER RED RIVER MILLSubstation-Adjacent230 kV300 MW1.4 yrs63.5
EC Near Mansfield MillGreenfield1.4 yrs59.1
EC Near Mansfield MillGreenfield1.4 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mansfield Mill, Red River Parish. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.