Mansfield Mill is a brownfield datacenter candidate site in Red River Parish, Louisiana, interconnecting through MISO. It screens at 63.6/100 DC Readiness with a catalogued 25 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN116653
Substation distance0.4 mi
Available capacity25 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.11¢/kWh
UtilityCLECO POWER LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth120
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance26.9 mi
Fiber providers2
Fiber coverage30.5%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance193.7 mi

Site characteristics

Site typeBrownfield
Parcel ownerIPC-Mansfield Mill
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usegas
Existing capacity25 MW
Retirement date2019-05-01

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index83.6 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance26.9 mi
Nearest rail0.3 mi
Nearest gas pipeline0.4 mi
Nearest fiber route78.4 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.12¢/kWh
Industrial electricity7.54¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$2,663

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mansfield Mill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
51
Speed to power20%
54
Fiber connectivity12%
61
Energy cost10%
88
Water risk7%
78
Natural hazard6%
42
Buildability7%
100
Labor market4%
50
DC cluster4%
60
Land / acreage3%
57
Construction cost3%
80
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Red River Parish, ranked by DC Readiness.

Sites near Mansfield Mill
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157576Substation-Adjacent500 kV1,000 MW2.8 yrs61.7
EC Near Mansfield MillGreenfield——1.4 yrs58.7
EC Near Mansfield MillGreenfield——1.4 yrs57.9
CARROLLSubstation-Adjacent230 kV300 MW2.8 yrs57.5
UNKNOWN112571Substation-Adjacent230 kV300 MW2.8 yrs57.1
EC Near Mansfield MillGreenfield——1.4 yrs56.9
EC Near Mansfield MillGreenfield——1.4 yrs56.8
EC Coal Red River ParishGreenfield——1.4 yrs56.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mansfield Mill, Red River Parish. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.