Datacenter Sites in Red River Parish, Louisiana
Red River Parish has 19 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 1,925 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Red River Parish, Louisiana has 19 scored datacenter candidate sites averaging 54.5/100 DC Readiness, roughly in line with the Louisiana average of 53.1. It ranks 26th of 59 Louisiana counties by number of sites and 13th by average score. The top-scoring site is Mansfield Mill at 63.7/100.
Site-selection context for Red River Parish
Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.
How does Red River Parish compare with other counties in Louisiana?
By number of scored sites, Red River Parish ranks 26th of the 59 Louisiana counties with a county page, holding 1.1% of the state's 1,762 sites. Its average DC Readiness of 54.5/100 ranks 13th in the state and is roughly in line with the national average of 53.2. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 9 score 55 or higher.
What types of datacenter sites are in Red River Parish?
Greenfield sites are the most common (13, 68% of the county's inventory), followed by substation-adjacent (3) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Red River Parish?
Industrial electricity averages 7.54¢/kWh and commercial 11.12¢/kWh. FEMA's National Risk Index rates the county "Very High" (58). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 2,700 cooling degree days a year with a mean temperature of 67°F. Land is valued around $2,663 an acre.
By site type
Top datacenter sites in Red River Parish
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Mansfield Mill | Brownfield | — | 25 MW | 4.3 yrs | 63.7 |
| UNKNOWN157576 | Substation-Adjacent | 500 kV | 1,000 MW | 4.3 yrs | 62.0 |
| CARROLL | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 57.8 |
| EC Near Mansfield Mill | Greenfield | — | — | 4.3 yrs | 57.7 |
| UNKNOWN112571 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 57.3 |
| EC Near Mansfield Mill | Greenfield | — | — | 4.3 yrs | 56.9 |
| EC Near Mansfield Mill | Greenfield | — | — | 4.3 yrs | 55.9 |
| EC Near Mansfield Mill | Greenfield | — | — | 4.3 yrs | 55.8 |
| EC Coal Red River Parish | Greenfield | — | — | 4.3 yrs | 55.6 |
| EC Near Dolet Hills | Greenfield | — | — | 4.3 yrs | 54.9 |
| EC Near Mansfield Mill | Greenfield | — | — | 4.3 yrs | 54.1 |
| EC Near Dolet Hills | Greenfield | — | — | 4.3 yrs | 53.9 |
| EC Near Dolet Hills | Greenfield | — | — | 4.3 yrs | 53.6 |
| EC Near Dolet Hills | Greenfield | — | — | 4.3 yrs | 53.1 |
| Greenfield (CARROLL - UNKNOWN157576) | Greenfield | 230 kV | 300 MW | 5.2 yrs | 50.8 |
| EC Coal Red River Parish | Greenfield | — | — | 4.3 yrs | 50.7 |
| EC FFE Red River Parish | Greenfield | — | — | 4.3 yrs | 48.3 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 46.8 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 46.4 |
Every scored site in Red River Parish
All 19 sites, best first.
- Mansfield Mill · 63.7
- Substation-Adjacent site · 24f830c4 · 62.0
- CARROLL · 57.8
- EC Near Mansfield Mill · a2ed9a02 · 57.7
- Substation-Adjacent site · 58d52788 · 57.3
- EC Near Mansfield Mill · 5a55761d · 56.9
- EC Near Mansfield Mill · 266b115a · 55.9
- EC Near Mansfield Mill · a558da94 · 55.8
- EC Coal Red River Parish · 7667b497 · 55.6
- EC Near Dolet Hills · 3566b88e · 54.9
- EC Near Mansfield Mill · e64756ea · 54.1
- EC Near Dolet Hills · 4f9c77e8 · 53.9
- EC Near Dolet Hills · 7b9e36ae · 53.6
- EC Near Dolet Hills · c4e8b661 · 53.1
- Greenfield (CARROLL - UNKNOWN157576) · 50.8
- EC Coal Red River Parish · 33f93339 · 50.7
- EC FFE Red River Parish · 48.3
- Mine Site · 8793ca22 · 46.8
- Mine Site · 9800e1d0 · 46.4
Red River Parish datacenter FAQ
How many datacenter sites are in Red River Parish?
19 scored datacenter candidate sites, averaging 54.5/100 DC Readiness. That is the 26th-most of 59 Louisiana counties with five or more sites.
What is the highest-scoring datacenter site in Red River Parish?
Mansfield Mill scores 63.7/100 DC Readiness, the highest of the 19 scored sites in Red River Parish (a brownfield site).
Does Red River Parish offer datacenter tax incentives?
Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.
What is the natural-hazard risk in Red River Parish?
FEMA's National Risk Index rates Red River Parish as "Very High" (score 58).
What are industrial electricity rates in Red River Parish?
Average industrial electricity is 7.54¢/kWh and commercial is 11.12¢/kWh in Red River Parish.
More in Louisiana
- All datacenter sites in Louisiana· 1,762 sites
- Operating datacenters in Louisiana
- Electric substations in Louisiana
- East Baton Rouge County· 173 sites · avg 55.9
- Orleans County· 126 sites · avg 56.0
- Caddo County· 111 sites · avg 56.5
- Calcasieu Parish· 111 sites · avg 51.8
- Lafayette Parish· 81 sites · avg 54.0
- Ouachita· 79 sites · avg 50.4
- Greenfield sites in Louisiana
- Substation-Adjacent sites in Louisiana
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Red River Parish, Louisiana”, https://gridcensus.com/datacenter-sites/louisiana/red-river-parish (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Red River Parish, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.