EC Near Mansfield Mill
GreenfieldRed River Parish, Louisiana · MISO
EC Near Mansfield Mill is a greenfield datacenter candidate site in Red River Parish, Louisiana, interconnecting through MISO. It screens at 57.2/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Red River Parish, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN157576 | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 69.7 |
| UNKNOWN112571 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 66.7 |
| UNKNOWN157576 | Substation-Adjacent | 500 kV | 1,000 MW | 3.4 yrs | 65.4 |
| CARROLL | Substation-Adjacent | 230 kV | 300 MW | 3.4 yrs | 65.3 |
| Greenfield (MOUNT OLIVE - UNKNOWN157576) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 63.7 |
| INTERNATIONAL PAPER RED RIVER MILL | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 63.5 |
| EC Near Mansfield Mill | Greenfield | — | — | 1.4 yrs | 59.1 |
| EC Near Mansfield Mill | Greenfield | — | — | 1.4 yrs | 58.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Mansfield Mill, Red River Parish. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.